- 3.2: Educational
- 3.3: Office Projects
- 3.4: Residential
- 3.5: Commercial
- 3.6: Mixed Developments
- 3.7: Healthcare
- 3.8: Hotels
- 3.9: Sports and Leisure
- 3.10: Pharmaceutical
- 3.11: Industrial
- 3.12: Building Conservation
- 3.13: Institutional
- 3.14: Environmental
- 3.15: Highways & Bridges
- 3.16: Marine
- 3.17: Transportation Planning
- 3.18: Health & Safety
- 3.19: Building & Dilapidation Surveys
- 3.20: Risk Management
Accelerated Schools Projects Cork Dublin & Kildare
Project Name:
Accelerated Schools Projects Cork Dublin & Kildare
Means of Procurement: Design & Build
Client Name: Department of Science and Education

Kellystown, Dublin
Project Description:
These four schools indicated are part of a Department of Education scheme to build 30 schools in a 9 month period including planning and design and construction
These schools are constructed in “system” or “rapid build”, constructed in metal framing by ABM main contractors and Fusion steel framing specialists including car parking, site services and roadways.
To achieve this fast track programme the building structure was manufactured off site using an insulated light gauge steel frame system which eliminated more traditional methods of construction such as in-situ concrete and block work. This allowed the on-site works to the structure, including windows and roof, to be completed in 6 weeks
The schools which Hayes Higgins Partnership are currently working on, include
- 2 No. 16 classroom schools at Scoil Choilm Community National School, Porterstown Road, Kellystown, Dublin
- 1 No. 8 classroom school at Athy, Kildare
- 1 No. 8 classroom school at Rochestown, Cork.

Athy, Kildare
Description of the Tenderer’s Role:
Civil Structural Engineering Services
Innovation:
Design and Construction of the Schools at Kellystown and Athy was completed within 9 months. This is a testament to the system build process.
Planning issues outside our control affected the progress of the second school at Kellystown and the School at Cork.
Total Capital Value: €14m
Dates of Involvement: 2007 to 2009
Current Status of Project:
Blanchardstown Project 1 of 2 is complete.
Athy is Complete
Cork is on site, completion expected May 2009
Blanchardstown 2 of 2 awaits construction a new road by the local Authority before construction of the school can commence
Name and Contact Details of Project Referee:
Mr.Pat Cronin ABM Construction
+353 (0)1 8900919
Design Team:
Architect: Opperman Associates
Civil / Structural: Hayes Higgins Partnership
Mechanical / Electrical: Varmings
Quantity Surveyor : ABM
Latest News
Construction Complete on Hayes Higgins Designed Kilkenny Eastern Environs Road Improvement Scheme
The road improvements to the Golflinks Road, New Orchard Road & Lovers Lane provide a link between Kilkenny City and the Orbital Ring Road. Hayes Higgins Partnership acted as Civil Structural Consultants and PSDP on the scheme which was brought in on time and on budget.
Carlow Institute of Technology Student Services Building Extension
Hayes Higgins Partnership with a Team Led by Paddy Fletcher of Wejchert Architects.
New Look Website!!
Hayes Higgins Launch thelr new look website.
Quality Standards
Hayes Higgins Partnership have been awarded ISO 9001:2000 Award.
Engineers Ireland CPD Award
Hayes Higgins Partnership Accredited for Continual Professional Development (CPD) Compliance.




![[Link] Homepage](/uploads/images/home.gif)